ITAIPU DAM



























The Itaipu Dam  is a hydroelectric dam on the Paraná River located on the border between Brazil and Paraguay. The name "Itaipu" was taken from an isle that existed near the construction site. In the Guaraní language, Itaipu means "the sounding stone".
The dam is the largest operating hydroelectric facility in terms of annual energy generation, generating 94.7 TWh in 2008 and 91.6 TWh in 2009, while the annual energy generation of the Three Gorges Dam was 80.8 TWh in 2008 and 79.4 TWh in 2009. The dam's 14,000 MW installed capacity is second to the Three Gorges Dam's 22,500 MW, though. It is a binational undertaking run by Brazil and Paraguay at the Paraná River on the border section between the two countries, 15 km (9.3 mi) north of the Friendship Bridge. The project ranges from Foz do Iguaçu, in Brazil, and Ciudad del Este in Paraguay, in the south toGuaíra and Salto del Guairá in the north. The installed generation capacity of the plant is 14 GW, with 20 generating units providing 700 MW each with a hydraulic design head of 118 m. In 2008 the plant generated a record 94.68 TWh, supplying 90% of the electricity consumed by Paraguay and 19% of that consumed by Brazil.


In 1970, the consortium formed by the companies IECO (from the United States of America) and ELC Electroconsult S.p.A. (from Italy) won the international competition for the realization of the viability studies and for the elaboration of the construction project. Work began in February 1971. On April 26, 1973, Brazil and Paraguay signed the Itaipu Treaty, the legal instrument for the hydroelectric exploitation of the Paraná River by the two countries. On May 17, 1974, the Itaipu Binacional entity was created to administer the plant's construction. The works began in January of the following year. Brazil's (and Latin America's) first electric car was introduced in late 1974; it received the name "Itaipu" in honor of the project.


Formation of the lake

The plant's reservoir began its formation on October 13, 1982, when the dam works were completed and the side canal's gates were closed. Throughout this period, heavy rains and flooding accelerated the filling of the reservoir as the water rose 100 meters (330 ft) and reached the gates of the spillway at 10 a.m. on October 27.

Start of operations

On May 5, 1984, the first generation unit started running in Itaipu. The first 18 units were installed at the rate of two to three a year; the last two of these started running in the year 1991.



Construction

  • The course of the seventh biggest river in the world was shifted, as were 50 million tons of earth and rock.
  • The amount of concrete used to build the Itaipu Power Plant would be enough to build 210 football stadiums the size of the Estádio do Maracanã.
  • The iron and steel used would allow for the construction of 380 Eiffel Towers.
  • The volume of excavation of earth and rock in Itaipu is 8.5 times greater than that of the Channel Tunnel and the volume of concrete is 15 times greater.
  • Around forty thousand people worked in the construction.
  • Itaipu is one of the most expensive objects ever built.